Skip to main content
TeslaCharger
Vehicle guides//8 min read/By Joe McGrath

Updated

Audi Q4 e-tron Home Charging: Complete UK Guide (2026)

Vehicle guide

Everything you need to know about charging an Audi Q4 e-tron at home in the UK — charge times, best chargers, tariffs, costs, and installation guide.

Battery

77 kWh

20–80% at home

~6h 45m

AC limit

11 kW

20–80% at 8p

£3.70

Range

~240 mi

Vehicle-specific tariff cost

Audi Q4 e-tron charging cost at 10,000 miles.

EV electricity only, using 3.1 miles per kWh and assuming every charging kWh reaches the listed lower rate. Household electricity and the postcode-dependent standing charge sit outside these figures.

Compare the full household bill, eligibility and achievable off-peak share in the EV tariff decision guide.

Charger picks

Audi Q4 e-tron: 3 chargers we’d pick

Picked for the trade-offs that matter most when you’re buying for Audi Q4 e-tron specifically.

Charging Specs

The Q4 e-tron uses a Type 2 connector, which means every UK home charger will work. One variant quirk: the entry-level Q4 35 has a 7.4 kW onboard AC charger, while the 40/45/50 step up to 11 kW. On single-phase UK supply (most homes), all of them cap at 7 kW.

SpecQ4 35 e-tronQ4 40/45/50 e-tron
Battery55 kWh usable77 kWh usable
Max AC7.4 kW11 kW
Max single-phase (UK)7 kW7 kW
Efficiency~3.4 mi/kWh~3.1 mi/kWh
0-100% at 7 kW~8 hours~11 hours
20-80% at 7 kW~4.5 hours~6.5 hours

Practical Charge Times

DurationkWhQ4 35 RangeQ4 50 Range
2 hours14 kWh~48 miles~43 miles
4 hours28 kWh~95 miles~87 miles
6 hours42 kWh~143 miles~130 miles
8 hours56 kWh~190 miles~174 miles

Best Home Chargers

Ohme Home Pro — Best for Smart Tariffs (£539)

Talks directly to Octopus tariffs and schedules itself to the cheapest slots.

Wallbox Pulsar Max — Best Compact (£513)

Among the smallest chargers on the market. Six colour options, well judged against the Q4's restraint.

Andersen A3 — Best Premium (£900)

Anodised aluminium, 247 colours, hidden-cable system. In keeping with the Audi's design language.

Full lineup at our charger comparison.

Running Costs (10,000 miles/year)

TariffRateQ4 35 CostQ4 50 Cost
Octopus Intelligent Go8p£235£258
Octopus Go8.5p£250£274
Standard26.11p£768£842
Petrol Q3/Q5£1,800+£1,800+

Installation

Standard process: choose charger, site survey, 2-4 hour installation, £800-1,200 total. See our installation guide or cost breakdown.

The Bottom Line

Type 2 connector, sensible battery, efficient enough to keep running costs under £260 a year on the right tariff. There is little drama to home charging a Q4 — and that is the point.

FAQ

Frequently asked questions.

On a 7 kW home charger, the Q4 35 e-tron (55 kWh) takes approximately 8 hours for a full charge. The Q4 40/50 (77 kWh) takes around 11 hours. A 20-80% charge takes 5-6.5 hours.